A new £7.5million leisure centre has opened in Tewkesbury to replace the ageing Cascades Leisure Centre.
The new Tewkesbury Leisure Centre includes a main five lane, 25m pool, a 20m learner pool and a range of splash water fun features. It also houses dry-side facilities including a 60-station gym, sauna and steam rooms, a flexible activities studio, a café and a shop.
F T Leisure was responsible for the supply, installation and commissioning of the water treatment and filtration systems as well as providing the water features working alongside Van Egdom.
The centre is being operated by Places for People, the main contractor was Willmott Dixon (Bristol), the architect was Pozzoni and consultants were Desco. The centre was officially opened by Olympian, Sharron Davies MBE and up-and-coming local swimmer, Levana Hanson.