Following the 2012 London Olympics, Sport England were gifted one of the training pools from the Games to issue the major mechanical parts to a venue that satisfied their needs requirement. The Scarborough Leisure Centre met those needs and were gifted a pool shell, diving head wall, filter vessels, pumps, heating, ultraviolet disinfection and chemical […]
scarborough
The Crown Spa Hotel in Scarborough is one of the first commercial water leisure venues to benefit from the smart technology control and energy cost savings of Calorex’s new Delta environmental control system. The updated Delta 6 was selected as the ideal upgrade for a Calorex Delta 6B, which had provided 14 years of trouble-free […]