OLYMPIC LEGACY FOR PARIS

La Defense Arena in Paris was transformed into a temporary Olympic swimming venue in just 60 days, reports Judith Wojtowicz. The home of French rugby, and just days previously the setting for Taylor Swift’s record-breaking Eras Tour, La Defense Arena was transformed in an astonishing feat of technical and architectural engineering. Two modular 50m pools, […]

Read More

STANDING OUT FROM THE CROWD

Panel pools are the industry’s flexible friends… Panel pools stand out from the crowd as one of the fastest and cleanest way of installing a pool. With an average residential pool installation time between three to five hours, installers can save a lot of time, so they can move on to other aspects of the […]

Read More