inverness leisure

Upgrades Underway At Inverness Leisure

Work is well underway at Inverness Leisure on the refurbishment of the existing pool filtration equipment and the installation of a state-of-the-art backwash water recovery system. Main contractor Morrison Construction appointed aqua leisure specialist Barr + Wray to renovate the filtration equipment used in both the 25m competition pool and the three flume leisure pools. […]

Read More