A turnkey project, the Hydro Active team, based in Doncaster, took on the supply and installation of this Vita XL4 swim spa, that was to be installed in-ground complete with a bespoke cedar enclosure, paving and turfing. The team had to overcome difficult conditions and very limited access to deliver. All works were carried out […]